Santa Fe Area Trail Conditions

You are not logged in. Would you like to login or register?

  • Index
  •  » Hermit Peak/El Porvenir Canyon
  •  » Some Trail Work Completed
  • Post a reply

    Write your message and submit Help

    Usage Terms

    Go back

    Topic review (newest first):

    7/26/2021 10:10 am

    As of summer 2021, El Porvenir Trail and Hermits Peak Trail have had some work done by volunteers and a youth trail crew. El Porvenir was cleared of deadfall for the first several miles. Hermit's Peak trail has undergone some tread work, including improved water drainage features and removal of loose rocks part way up to the Peak. Trail work on this stretch is ongoing and some erosion and rocky terrain still exists where crews did not make it up the Peak all the way. The bridge at the bottom of Hermit's Peak trail has been repaired. 

    Board footera

     

    Powered by Boardhost. Create a Free Forum


    Hints:
    All of the hikes in the Guide are listed as separate forums in alphabetic order (as named in the Guide).
    You need not register to view or contribute trail condition reports.
    To look for trail condition reports, scroll down the list to find a trail and then click to read any reports.
    To add trail condition reports, scroll down the list to find a trail and then click to find any reports. To update an existing report, click on the report and then on Post Reply. To start a new report, click on New Topic.

    DISCLAIMER: This is an open Message Board to which anyone can contribute. The accuracy of the information is neither verified nor warranted.